Building permit cost and timeline calculator
See what the paperwork for a building permit could cost, whether you need a registered architect or engineer, and a date for each phase up to the day you must start building.
Building permit cost and timeline
See what the paperwork could cost, whether you need a registered architect or engineer, and the dates for each phase. Get the fee per square metre from your municipal corporation.
Dates are estimates. Approval can take longer if the corporation refers your plans to other agencies. If you do not start within six months of approval, you must apply to renew it.
How to use it
- Enter the floor area of all floors added together, in square metres or square feet.
- Choose your parish to see which municipal corporation you apply to.
- Add the fee per square metre your corporation quotes, and prices from your draughtsman and surveyor.
- Set when you'll start on the plans and how long each phase should take.
What the results mean
Buildings over 300 square metres must be designed and stamped by a registered architect or engineer. The dates show when your plans should be ready, when to submit and when to expect a decision. If you don't start building within six months of approval, you must apply to renew it.